✓ The building previously located on the site has been completely demolished. ✓ A geological study of the soil was performed, with soil samples sent to the laboratory to assess the requirements for the foundation. ✓ The first stage of architectural design has been completed with the approval of the living area. The second stage has begun, which includes creating a detailed project plan. ✓ A structural design has been finalized. ✓ Preparatory work for soil reinforcement has been completed, including excavation to a depth of 3 meters.