Stay&Rent
en

October 2024

The building previously located on the site has been completely demolished.
A geological study of the soil was performed, with soil samples sent to the laboratory to assess the requirements for the foundation.
The first stage of architectural design has been completed with the approval of the living area. The second stage has begun, which includes creating a detailed project plan.
A structural design has been finalized.
Preparatory work for soil reinforcement has been completed, including excavation to a depth of 3 meters.